

Problem & Diagnosis
A 20,500 m² distribution shed with aged metal laps and gutter segments past service life — water tracking into storage bays on several aisles after each rain event. Detection mapped the leak clusters before anything was priced — see ../../roof-leak-detection-dubai/ the detection process.
Solution — Method
Full-shed EPDM treatment: mechanical re-fixing, lap sealing and gutter section re-lining bay by bay, with temporary catchment and daily water-tightness sign-offs per the ../../waterproofing-for-warehouses/ live-site protocol.
Result & Warranty
Program closed bay by bay with documented sign-offs; the handover file carries datasheets, annotated photos and the warranty certificate. The EPDM system choice is explained on ../../epdm-roof-waterproofing-uae/ its method page.
Same Shed Profile?
Bay-map diagnosis first — the same program methodology quoted per phase.