Roof Waterproofing & Leak Repair Specialists

Mon – Fri: 9:00 AM – 6:00 PM · Emergency support 24/7 +971 55 772 3750 sales@pebinternational.com
HomeHomeProjects

CPL Logistics Metal + EPDM

20,500 m² metal roof treated

RoofProfiled metal sheet — laps and gutter lines
Scope20,500 m² metal roof treated
SystemEPDM lap + gutter sealing — see EPDM method
WarrantyDocumented 5-year warranty
01

Problem & Diagnosis

A 20,500 m² distribution shed with aged metal laps and gutter segments past service life — water tracking into storage bays on several aisles after each rain event. Detection mapped the leak clusters before anything was priced — see ../../roof-leak-detection-dubai/ the detection process.

02

Solution — Method

Full-shed EPDM treatment: mechanical re-fixing, lap sealing and gutter section re-lining bay by bay, with temporary catchment and daily water-tightness sign-offs per the ../../waterproofing-for-warehouses/ live-site protocol.

03

Result & Warranty

Program closed bay by bay with documented sign-offs; the handover file carries datasheets, annotated photos and the warranty certificate. The EPDM system choice is explained on ../../epdm-roof-waterproofing-uae/ its method page.

Scope and key metrics for this project are recorded in the handover file and confirmed with the client.

Same Shed Profile?

Bay-map diagnosis first — the same program methodology quoted per phase.