RoofMixed stock: metal + concrete roofs
ScopeMultiple buildings, mixed roof types
SystemHot-adhesive membrane (160°C) + EPDM — see combo roofing
WarrantyDocumented 5-year warranty


01
Problem & Diagnosis
A multi-building estate where diagnosis had to switch mental models building by building: metal sheds failing at laps and gutters, concrete blocks failing at screed and parapet details.
02
Solution — Method
Program split by building type: EPDM lap/gutter works on the metal stock; hot-adhesive membrane system (160°C application) on the concrete scopes — each building phased and signed off independently.
03
Result & Warranty
The two-system approach ran without conflicts, with sign-off per building; the mixed-stock logic is described on ../../combo-roofing-uae/ the combo roofing page.
Scope and key metrics for this project are recorded in the handover file and confirmed with the client.
Metal Roofs Next To Concrete?
Two mental models, one program — quoted per building type.