BuildingThe largest Reem Mall in the UAE
EnvelopeSandwich-panel waterproofing across 30,000 m²
DetailsOver 1,000 linear metres of expansion joints and penetrations sealed
WarrantyDocumented 5-year warranty


01
Problem & Diagnosis
A vast mall envelope built on sandwich panels leaks the way panel buildings always do — where two panels meet and wherever the structure is penetrated. Scale is the real challenge: every joint is a potential water path.
02
Solution — Method
Over 1,000 linear metres of expansion joints and penetrations were sealed across the envelope, with sandwich-panel waterproofing applied across 30,000 m² — panel by panel, zone by zone, verified before sign-off.
03
Result & Warranty
The full envelope delivered in 2026 under our documented warranty. Joint treatment of this type follows our lap & joint sealing method.
Scope and key metrics for this project are recorded in the handover file and confirmed with the client.
Large Envelope To Seal?
Joints, penetrations and panels — one documented scope.